construct 3-sided empi structure
biloxi ms
Department of Veterans Affairs
Complete
Diversified Site Services completed constructing a 120' by 80' pre-engineered I-Beam metal structure with an open western side, installing power and water connections, providing electrical components such as panels, transformers, and receptacles, and installing 485' of 8'-high anti-climb fencing with a slide/roller gate. Diversified also handled the necessary earthwork, framing, concrete slab pouring, and restoration of disturbed areas. Our team met all requirements and ensured compliance with codes and regulations.