SPS Sewer Deficiency
Salisbury NC
department of veterans affairs
complete
Diversified was entrusted with a significant project comprising multiple crucial tasks, which have now been completed. Our responsibilities included the installation of a duplex sanitary sewer pump station, which entailed removing existing concrete sidewalks, excavating the area, and installing the pump station along with its control panel. Additionally, we were tasked with implementing a 4-inch sanitary sewer force main, which involved removing sidewalks and pavement, utilizing different methods to install the force main, connecting it to the pump station and existing sewer system, and restoring the affected areas. Furthermore, we handled the electrical work, ensuring the provision of power to the pump station. Finally, we carried out the plumbing work, specifically replacing and connecting drain pipes.